Watch out, Bambi. The City of Batavia is coming for you.
A three-phased plan intended to harvest up to 60 deer per year with archery-only hunting is expected to be presented to City Council at its Conference Meeting at 7 p.m. Monday at the City Hall Council Board Room.
According to memo dated July 6 from Acting City Manager Rachael Tabelski to Council members, the City’s Deer Management Plan Committee, formed in November, has completed its task in the form of a 21-page plan to reduce the deer population within the City limits. The committee was created in response to numerous incidents of property (landscaping/garden) damage, auto accidents and other problems caused by deer.
Working with Robin Phenes, state Department of Environmental Conservation wildlife biologist, and Council Member John Canale, the five-member committee, per the memo, has drafted a proposal that “provides a streamlined program experience and ensures programmatic compliance, program metric tracking and stakeholder/City Council communication.”
In simpler terms, the plan specifies the time frame, five designated hunting zones, and rules and regulations, and includes permit applications, landowner cooperation agreement, hunter applications, waivers and release forms and a proficiency test.
Tabelski spelled out several highlights of the plan:
-- Plan A, hunting during the New York State regulated hunting season; Plan B, an extended hunting season (Jan. 2-March 31); Plan C, archery hunt utilizing bait (subject to Council approval). Times for hunting will be from sunrise to 2 p.m., with no hunting when schools are closed.
-- Five designated hunting zones as identified on an included map, as follows: (1) parcel north of Clinton Street, (2) land in the Naramore Drive area and north, (3) property west of State Street (in vicinity of BOCES) and proceeding north from Lambert Park, (4) Route 98, south of Walnut Street area, and (5) Law Street area stretching almost to Kibbe Park.
-- Hunting will be permitted only after the landowner signs a cooperation agreement form.
-- Tree stands must be used and all hunters must shoot downward. Hunters must be properly qualified and licensed and apply to the City of Batavia to be admitted into the program.
-- The plan is subject to NYS DEC setback requirements pertaining to the proximity of bow hunting to schools, playgrounds, public buildings, etc.
-- The program will run for three years and can be terminated at City Council’s discretion.
Citizen members of the committee are Russell Nephew, Gus Galliford, Fred Gundell, Kent Klotzbach and Samuel DiSalvo.
Council will be asked to vote on forwarding the resolution to a future Business Meeting.
Other topics on Monday’s Conference Meeting agenda:
-- A draft resolution to grant approval to Eli Fish Brewing Co. at 109 Main St. for a temporary outdoor dining license agreement as part of the City’s COVID-19 2020 Temporary Outdoor Dining on City Property Program.
Eli Fish’s application specified that 12 tables, serving up to 52 guests, will be placed in Jackson Square, with hours of operation set at 11 a.m. to 10 p.m. Monday through Saturday.
A memo from Tabelski dated July 7 indicated that while the Eli Fish application qualified for consideration, an application from Main Street Pizza at 206 Main St. did not and is not recommended for approval.
Vic Marchese, owner of Main Street Pizza, had proposed to put up a 15-foot by 75-foot tent, with lighting, in the parking lot on the east side of the restaurant – utilizing seven to eight parking spaces. Eight to 10 tables, accommodating up to 60 guests, were to be placed under the tent.
Tabelski spelled out several reasons why the plan would not be feasible:
-- Per the state Building Code, a tent can not be put up within 20 feet of lot lines, a parking space, buildings, etc.;
-- The City does not own the entire parking lot;
-- The application removes several prime parking spaces, including handicap spaces;
-- The one-way street would require a traffic order and, for a temporary dining basis, the City would not be able to facilitate a Local Law change in a timely fashion;
-- A traffic safety issue would occur due to cars coming into the lot off Main Street and backing out of parking spots.
Tabelski wrote that she advised the applicant of the potential problems, but he “was not interested in modifying the application.”
A draft resolution for the Main Street Pizza request is not included in the meeting document packet.
-- A pair of draft resolutions concerning a feasibility study for the construction of a new police station at the Alva Place location and corresponding contract with an architectural firm to conduct the study.
The first resolution asks City Council to transfer $50,000 of the $242,820 in the Facility Reserve fund to an expense account.
The second resolution seeks execution of a contract for $41,200 with Architecture Unlimited LLC, of Williamsville, to provide the recommended square footage, design and layout, ability to expand, regulatory requirements and projected costs for design and construction for both the site work and the actual facility.
-- City Council will conduct a Business Meeting after the Conference Meeting. Agenda items for that session include a resolution to enter into a $328,200 contract with Keeler Construction for the Franklin Street-Richmond Avenue sewer rehabilitation project.
The cost is significantly less than the original estimate of $806,000 because the City altered its plan from a complete sewer line replacement on Franklin Street to an excavated repair of one section and relining of the rest of the line, and then to include relining of the Richmond Avenue sewer ahead of its rehabilitation project in 2022.