The steel frame for the new Oliver's sign was anchored in place today. The concrete foundation needs to set for as much as four weeks before the new sign is put on the frame. The same day the new sign is installed, the old Oliver's sign will be removed and taken to storage.
Previously: Oliver's Candies planning new neon sign with message board