Town planners approve additions at O-At-Ka Milk, Gateway GS LL site on Call Parkway
The Town of Batavia Planning Board on Tuesday night approved site plans for additions at O-At-Ka Milk Products on Ellicott Street Road and to buildings under construction by Gallina Development of Rochester at the Gateway GS LLC site on Call Parkway, north of the Thruway interchange.
Kelly Finch, senior director of engineering and operational technology at O-At-Ka Milk, explained that the project involves “increasing the plant’s capacity by fully utilizing what is there.”
Specifically, O-At-Ka Milk plans to construct a 58- by 70-square-foot addition that includes three storage tanks for the company’s growing alcohol-based beverage operation.
Finch said one of the tanks measures 15 feet high by 8 feet in diameter and the other two measure 28 feet high by 12.5 feet in diameter. The addition is to be placed on the south side of the property, which spans the corner of Ellicott Street Road and Cedar Street.
Rod Ives, civil engineer for Napierala Consulting of Syracuse, shared that the addition will go in an area that currently is paved, resulting in no stormwater runoff.
The planning board conducted a State Environmental Quality Review and found no adverse effects before voting in favor of the site plan.
Following that, the board voted favorably on the SEQR and site plan submitted by Gallina Development to change the square footage of two office buildings under construction.
The first would increase from 22,000 square feet to 30,000 square feet and the second would go from 27,000 square feet to 33,600 square feet. A third building, designated for future construction, will be reduced from 27,000 square feet to 17,400 square feet.
Overall, the total area of development originally approved – five building lots -- would remain at 135,000 square feet.