Skip to main content

news

Hawley lauds passage of bill granting free college tuition to members of Gold Star families

By Press Release
Press release:

Assemblyman Steve Hawley is hailing the passage of a bill (A7685) through both houses of the Legislature that would give members of Gold Star families free college tuition.

The passage of this bill comes two years after Hawley himself proposed a bill to provide Gold Star families with free tuition, though that bill was blocked in the Higher Education Committee by the Assembly Majority and never brought to the floor for a vote.

“Today is a great day for our military families throughout the state to be shown some appreciation for their service and sacrifice,” Hawley said yesterday. “If somebody gives their life for our nation and our Constitution, the least we can do is help get their loved ones through school.

"While I wish we were able to get this bill voted on and passed two years ago to help even more Gold Star families, I am glad to see this bill become law to help those who lost people they loved while defending the country we love.”

Lots of LGTBQ+ Pride Month activities this weekend

By Press Release

Information provided by GLOW OUT! and GO ART!

The long "weekend" of events celebrating LGTBQ+ Pride Month continues in Batavia through June 13, hosted by GLOW OUT! and GO ART!

This evening, June 11, from 6 to 8:30 at the Batavia First Presbyterian Church (300 E. Main St.), there will be a Game Night and Royal Court Competition, for all ages. There will be food (individually wrapped), outdoor games and board games, plus free make-and-take baby sunflowers and sidewalk chalk art.

The Royal Court Competition at the church begins at 7:30 p.m. and is open to all genders and ages. It is judged on best costume and dance moves. The theme is DISCO. All are invited to attend. Masks are required. Regulations are subject to change.

Also tonight from 8 p.m. to 2 a.m. at GO ART! (201 E. Main St., Batavia) there will be a Disco Open Mic and Piano Bar hosted by the incomparable Drag Queen -- Ms. Figgy Pudding. This event will be for ages 21+.

GO ART! is opening Tavern 2.o.1, for the first time since the coronavirus shutdown in March of 2020, for the LGBTQ+ community. Come read your favorite poem, try your skills at stand-up and disco, or sing your favorite Broadway tune (bring your own music our look through our extensive collection). GO ART!'s own Theresa Kehl will be at the piano.

There is no door fee, but tipping your entertainers is encouraged. Masks are required at this event. Regulations are subject to change.

Saturday, June 12, is the annual Pride Parade starting at 10 a.m. at GO ART! If marching, lineup will be at 9 a.m. We proceed from GO ART's historic Seymour Place building to Dwyer Stadium (at Denio and Bank) where the Pride Festival will be held.

This will feature a cornhole tournament hosted by Pride Sports USA (volunteers needed to assist), and be full of amazing Drag Queen performances, including our headliner, Mrs. Kasha Davis from "RuPaul’s Drag Race"! Also entertaining will be the Buffalo Gay Men's Chorus, the Fortunatones, and more! Vivian Darling & DeeDee Dubois will be emceeing.

The festival at the stadium runs from 11 a.m. - 4 p.m. and is the only event city requiring a ticket. Food and alcohol concessions will be offered for purchase by Dwyer Stadium.

On June 12 there will also be a concert at Jam at the Ridge in Le Roy starting at 4 p.m. The headline performer will be Ddendyl Hoyt, of Western New York, who is best known for her appearance on Season 6 of NBC’s “The Voice.” Tickets are $10 for lawn seats; $20 for VIP seating.

On Sunday, June 13 its Drag Queen Story Hour at GO-ART! at 10 a.m. and again at 1 p.m. hosted by Ms. Figgy Pudding. In addition, there will also be Drag Queen Bingo at 11 a.m. and 2 p.m.

Two years ago, Batavia Pride had its inaugural year that was so well received in the community! After a year off, we are excited to come back bigger than ever with more events and opportunities for our community to show their PRIDE!

You can sign up for all events here.

Disclaimer

Due to COVID-19 regulations, masks will be required and different events will have different policies and rules. Please check out our website for COVID-19 regulations for each individual event!

Planners get lesson in Plug Power's green hydrogen production, question county holding water in reserve

By Mike Pettinella

Genesee County Planning Board members Thursday night, on their way to approving the site plan for the Plug Power Inc., green hydrogen facility at the Western New York Science & Technology Advanced Manufacturing Park in the Town of Alabama, were on the receiving end of an education about the company’s operation from its vice president of project development.

Plug Power, a publicly traded business based in Latham (outside of Albany), is primed to become the first tenant at STAMP – with plans to put up an 8,000-square-foot operations and maintenance building, a 40,000-square-foot electrolyzer building and a 68,000-square-foot compressor building on the Crosby Road tech park.

The company is the world’s largest producer of hydrogen fuel cells that power forklifts and heavy-duty freight and its facility to be located at STAMP will be the largest in North America.

“This is the largest green hydrogen facility in North America by a lot,” Brenor Brophy said. “It actually is the largest green liquid hydrogen facility in the world. So, it is a major step forward in the energy transition from fossil fuels to renewable energy.”

Brophy took planners through the process of taking fresh water and electricity and turning that into hydrogen and oxygen. Plug Power had been making hydrogen cells for the warehouse and logistics industry and, last year, started making its own hydrogen.

“This is a green hydrogen product; fuel that is made from zero-carbon renewable energy,” Brophy said. “This is the hydroelectric energy from Niagara …”

He said Plug Power will harness renewable energy from the new substation that the company is building on the STAMP site – a facility that is large enough to power their entire park.

“We will take about half of that energy for our facility,” he said. “We take fresh water and electricity and we split it into hydrogen and oxygen. The only emission we have from this site is pure oxygen. We take that hydrogen gas and we cool it down to what I call biogenic temperature that turns it into a liquid.”

From there, tanker trucks will transport the liquid hydrogen to Plug Power customers all over the Northeast region.

Brophy said the firm’s customers include Walmart, Kroger’s, Amazon, Home Depot and Lowe’s.

He said the plant will produce 45 metric tons of hydrogen per day, with each truck holding about four and a half metric tons.

“So that means there will be approximately 10 trucks per day on average,” he said. “Not every truck is full leaving or (it could be) empty coming back, so it may be 10 to 12 trucks per day, which is quite low.”

Brophy called it a “beautiful site” on 30 acres. He said plans call for the placement of a row of trees along the front to obscure it from the road.

“It is a very important site,” he said. “We are absolutely delighted to be siting it in Western New York as a New York company. This is our first and biggest green hydrogen plant in what will be a national network.”

Planner Tom Schubmehl, who abstained from voting, was prepared with a list of questions about the project that focused on the following:

  • Start-up Date

Brophy said he expects “to finish commissioning” in late 2022 or early 2023.

  • Wastewater

Brophy said there are two components – the sanitary sewer needed for employees on site and discharge of leftover process water.

He said the number of employees on site is not large enough to support the construction of an actual wastewater treatment facility “so we will have a tank system there that will be approved by the DEC that we will have emptied out until such time as the wastewater treatment plant will require construction.”

“As far as what we call the process water … we will have the forced main that will discharge directly into Oak Orchard Creek and will require a permit from the (New York State) DEC (Department of Environmental Conservation).

  • Stormwater

Brophy said a stormwater retention pond is an allowable use in that area.

  • Reconstruction of Crosby Road

This will be done by the Genesee County Economic Development Center – a complete rebuild of the section from Stamp Drive south to the edge of Plug Power’s site. Also, a 12-inch water transmission main will be extended from Route 77 where it currently exists, down Stamp Drive and down Crosby Road to get to the Plug Power site.

  • Tanker Trucks (noting there is parking for 26)

​Brophy said those parked in the staging area will be empty so “when a driver shows up with an empty tanker we will have a full one waiting for them.”

  • Storage Steer

Brophy said that storage unit will hold a week of production.

“It’s a high-resilience network,” he said. “If one goes down, we can support other plants in the network from that. Our customers are folks like Walmart, Kroger or Amazon, and so we can never let that warehouse go down. Amazon can’t go down a week before Christmas so we aim for a really high-resilience network.”

  • Water Usage (noting the facility will use 280,000 gallons per day)

Schubmehl mentioned that Genesee County is calling for residents to conserve water this summer.

Mark Masse, GCEDC senior vice president of operations, said there is capacity coming up the line from Pembroke and County Engineer Tim Hens has “put place markers in for projects and Plug Power’s project has been held in the county water, so to speak, as a placeholder for a couple of years now. So, it has been accounted for and is included in those numbers.”

He added that GCEDC is pursuing another water line from Niagara County that could bring in an additional 1.5 million gallons per day.

“But the 280,000 gallons … that has been reserved in capacity in all of the numbers that Tim has been working with,” he reiterated.

Schubmehl responded that he was puzzled by that strategy.

“I just hope that you understand how difficult that is to know that this is what has been held in reserve while county residents are being told not to water their lawns this week,” he said. “It just seems a little odd.”

City fire chief leaves in July to start new job as deputy state fire adminstrator

By Billie Owens

From submitted statements; file photo:

Stefano Napolitano, chief of the City of Batavia Fire Department, has accepted a new job as deputy state fire administrator and officially starts in mid-July.

Today's announcement from the state's Office of Fire Prevention and Control says Napolitano will bring a wealth of experience to the office, including both career and fire service, county emergency management, and as a State Fire Instructor.

He has degrees in mechanical engineering, fire protection technology, and a Master of Science degree in Executive Fire Science Leadership.

“I would like to congratulate Fire Chief Napolitano for his leadership and dedication to the City of Batavia Fire Department over the last four years," said City Manager Rachael Tabelski.

"It was a pleasure to work with the Chief and I wish him great success in his new role as Deputy State Fire Administrator with the Office of Fire Prevention and Control (OFPC), part of the Division of Homeland Security and Emergency Services (DHSES).

"Chief Napolitano will continue to serve the City of Batavia until Friday July 9th. At such time an Interim Chief will be named. Please join me in congratulating him in his new role as a Deputy State Fire Administrator. "

City fire officers also congratulated the chief in a written statement, saying "Chief Napolitano has been an asset to the City Fire Department since being appointed in 2017. We wish him continued success and look forward to working with him in his new position."

Chief Napolitano is a Queens native who lived in the Mohawk Valley for about 45 of his 54 years.

Before coming to Batavia, Napolitano was deputy fire chief for the Village of Herkimer. While there, he assisted in development, revision and implementation of local disaster and emergency management plans, along with assisting in the county 9-1-1 dispatch communication center and the administration of the county’s mutual aid plan, mutual aid radio system and state fire training.

Rath reflects on end of session in Albany

By Press Release

Press release:

“The 2021 Legislative Session came to an end on June 10th, said Sen. Ed Rath. "Unfortunately, the session fell short in many ways and did little to help the struggling residents and small businesses of New York State. 

“The state has faced an extremely tough year and at a time when New York could have been a leader in COVID reopening and recovery, we saw confusion and misplaced priorities. Changing mandates, new taxes, increased spending were the common themes of the year.  

“While this session fell short in many ways, I was happy to be able to serve the residents of the 61st Senate District and to be able to get legislation passed to help our local communities. I look forward to returning to Albany, for hopefully a more ‘normal’ session.”

Photo: Solar eclipse

By Howard B. Owens

John Huenemoerder, of Pavilion, shared this photo he took on Walker Road of yesterday morning's solar eclipse.

County planners take no action as Route 19 resident objects to Town of Le Roy's rezoning proposal

By Mike Pettinella

A Lake Street Road (Route 19) resident has come out against the proposed rezoning of seven parcels of land meant to expand the Le Roy Food & Tech Park, claiming that changing it from Residential to Industrial contradicts the Town of Le Roy’s Comprehensive Plan and will prevent him from “the intended use and enjoyment” of his property.

Eric Baines Jr., speaking at Thursday night’s Genesee County Planning Board meeting via Zoom videoconferencing, said that in November he bought what is known as the Olmsted Manor, a 2,900-square-foot colonial house that is near the 75-acre industrial park on Route 19 and Randall Road owned by the Genesee County Economic Development Center.

He said he did not favor a referral submitted to the planning board by the Town of Le Roy to rezone seven parcels totaling about 185 acres to possibly set the stage for a cheese manufacturer, specifically the Ohio-based Great Lakes Cheese, to build a $500 million plant on land adjacent to the park.

Reportedly, Great Lakes Cheese officials have contacted landowners with purchase offers to expand the park to meet the company’s needs.

“At the time when we did our research, the 2017 published Town Comprehensive Plan said that the current use map did not reflect Industrial zoning as well as the future map does not show Industrial zoning surrounding – they’re both Agricultural,” Raines said. “Given that both maps reflect that, we (he and his girlfriend) made the decision to buy this house.”

Looking to Upgrade the Property

Raines said that “use and enjoyment of our land (14 acres) will be jeopardized by this rezoning as we intend fix up the place.”

“This is an historical house, which we’re proud to own … in an historic district in Le Roy,” he said. “We wanted to grow our own food here and largely be independent. To say we are against the industrialization of the agricultural land behind this is not to just push it behind me and go somewhere else.

“We are opposed to it, in general, as to be reflected by the vegetable garden we put in almost immediately. If anybody goes by on Route 19, I am sure you have seen that the place has not been taken care of over the past 50 years, but it is now because we’re here.”

Raines said his plans for the property include recreational hunting, expanding his garden and putting up bat houses to keep the ecosystem healthy.

“This (rezoning and siting of the cheese factory) will trigger a laundry list of chain events that will prohibit any of what we hope to do,” he said.

Responding to a question from Planning Board Member Eric Biscaro, Raines said his property extends right to the line proposed for the cheese plant. He then brought up issues of smell and noise.

“For a $500 million plant, to say there won’t be noise (is not true),” he said. “The electromagnetic radiation alone coming from this plant is going be astronomical, and not something that we had any intention of being surrounded by.”

He said this action does not seem fair, believing that the comprehensive plan serves as a land use document governed by state law and is good through 2029.

Board Only Looking at Rezoning Referral

County Planning Director Felipe Oltramari said that last night’s referral only addresses the rezoning change, not the proposed cheese manufacturing plant.

“The planning board is only considering a rezoning request, which can be made with or without a project,” he said. “If it does get rezoned and a project does come to fruition, we will be reviewing all environmental impacts, including odor and noise, lighting, anything you may think of as part of that project, which would be a separate referral.”

Oltramari sought to clarify the zoning procedure, stating that the comprehensive plan and future land use maps serve as “guidance” but do not restrict municipalities or draw specific boundaries for rezoning.

“You have points that are definitely valid,” he said in response to Raines. “It’s just I wouldn’t go as far as saying that because that area is (zoned) Agriculture, that it should stay Agriculture until 2029. In theory, actually, the town board could amend the future land use plan … through a public process … before 2029 and completely overhaul the comprehensive plan in two years or something like that.”

Raines contended that neighbors who own a horse farm would be “stripped of their horse pasture if this goes through,” and mentioned that he heard talk of eminent domain, which is the right of a government or its agent to expropriate private property for public use, with payment of compensation.

He also said some of his other neighbors are against rezoning and the potential 480,000-square-foot manufacturing plant.

Masse: No Talk of Eminent Domain

Mark Masse, GCEDC senior vice president of Operations, quickly disputed the eminent domain claim, stating that the agency’s board of directors will not participate in that process.

“We have not done it, we have not proposed it, we have never brought it up, and we have never spoken about it,” he said.

Planning Board Member Bob Bennett, referring to eminent domain, noted that GCEDC won’t be the owners of the properties on track to be rezoned.

Contacted this morning, Le Roy Town Supervisor Jim Farnholz disputed the eminent domain claim – “a private entity can not move forward on eminent domain,” he said – and that to his knowledge, “there has been no resistance whatsoever from landowners who have been approached (by Great Lakes Cheese.”

“I know that some of the neighbors have sold significant property to Great Lakes Cheese and that the Falcone Funeral Home is no part of this since they operate under a special use permit in an R-2 zone,” he said. “In fact, changing to an I-2 zone would give him a sense of security for his business.”

Farnholz also mentioned that Raines has a 12-acre buffer behind his house “that is completely grown in, so he wouldn’t see the project” and that all odor, noise and wastewater issues have to meet New York State Department of Environmental Conservation standards.

Le Roy Planners to Meet on Tuesday

The supervisor said that the Le Roy Planning Board will address the issue next Tuesday and that the town board has scheduled a public hearing on the matter for July 8.

As far as the county planning board, it took no action as a motion to approve the rezoning referral died for a lack of second, and a subsequent motion for disapproval did not gain the necessary five votes.

Oltramari said it now goes back to the Town of Le Roy, which can act without a recommendation from county planners.

The planning department had recommended approval since the comprehensive plan adopted by the Town of Le Roy in 2017 identifies this area in its Future Land Use Plan as Agriculture and adjacent to Industrial. Thus, Oltramari wrote, it can be argued that rezoning the property to an industrial use that supports agriculture is consistent with the plan should pose no significant countywide or intercommunity impact.

Earlier in the meeting, Masse said his view was that the town was “trying to be proactive – trying to be ahead a little bit.”

“Obviously, our board approved a purchase and sale agreement for one business (BioWorks Inc., of Victor) at the Le Roy Food & Tech Park that’s existing there – to take 60 of the 75 acres. I think the town is seeing that hopefully will be successful and is trying to be proactive by rezoning some of the other parcels there to help grow that,” he said.

Prospective Company Talking to Landowners

Masse said GCEDC wouldn’t be purchasing the other parcels to be rezoned.

“At this point in time, the companies that have been interested in it have been talking – we put them directly in touch with the property owners,” he said.

He added that BioWorks would be looking at West Bergen Road and Route 19 as entrances and exits.

Bennett mentioned that if the cheese factory was to come in with 500 jobs, “that’s a lot of traffic to come out to West Bergen Road and Route 19.”

“If a company were to locate there, on those back parcels, they would probably come in off of (Route) 19 – that would be the main traffic,” Masse replied. “That would be a shared entrance for our park as well as those back parcels. And that’s going to be driven by the Department of Transportation as well, whether there would be any improvements required there or not.”

Masse said BioWorks is creating 30 jobs but has yet to apply for (tax) incentives.

“Their truck traffic would be like FedEx and UPS delivery trucks,” he said. “It wouldn’t be anything heavy, and from a water standpoint, that particular project plans on recycling all rainwater … and will have very little to no municipal use.”

He added that GCEDC is looking at different options to supply natural gas to the property.

Zoning map at top shows the current zoning, left, and the proposed zoning -- changing the parcels in yellow (Residential) to light purple (Industrial) next to the Le Roy Food & Tech Park.

Accident with injuries reported on the Thruway in Batavia

By Howard B. Owens

A two-car accident with injuries is reported on the Thruway in the westbound lane in the area of mile marker 391.9.

Town of Batavia fire and Mercy EMS dispatched.

UPDATE 10:18 p.m.: Town assignment back in service. 

City Historic Preservation Commission members applaud GCASA's renovation of 434 East Main St.

By Mike Pettinella

While preserving the historical integrity of a stately home built 140 years ago, the Genesee/Orleans Council on Alcoholism and Substance Abuse has advanced its mission to helping those in recovery by opening up five permanent housing apartments.

And members of the City of Batavia Historic Preservation Commission couldn’t be happier.

“It’s wonderful that they’ve made the effort to save the original detailing in the house -- the stained glass windows, the woodwork and the trim and the fireplaces,” City HPC President Sharon Burkel said. “To be able to bring it back to a useful part of the community and to maintain the history of the house is outstanding.”

Burkel and City HPC colleagues Connie Boyd and Caroline Hosek recently toured the home at 434 E. Main St., which is part of the GCASA campus along that stretch of the road. All three said they were thrilled with the renovations.

“I’m so impressed with the work that has been done, and especially pleased to see things that have been maintained that were original to the structure, such as the crown molding, the original mantles and the parquet floor. It’s just an incredible job,” Boyd said.

Hosek agreed, commending “the effort that has been put into bringing the building back to its original glory and providing such a valuable service to families who need the support.”

GCASA Executive Director John Bennett said the agency had its work cut out for it when it took on the project, which will provide low-income housing under the supervision of its Residential Program’s case managers. Three apartments are on the first floor and two are on the second floor.

“It was in very bad disrepair, really falling apart,” Bennett said. “The boards of the porch were literally falling off the ceiling and it was sagging. We’ve redone the inside in keeping with the historic nature of the building. We rebuilt the porch, put in new kitchens, restored the fireplace and had the house painted.”

Bennett said the goal was to be “good stewards” of the home.

The list of the general construction tasks is significant, including:

  • Scraping and repairing all plaster walls, painting walls and trim;
  • Replacing several kitchen cabinets and fixtures, and existing vinyl floors with new vinyl floor;
  • Replacing bathroom fixtures and vinyl floor, and deteriorated wood windows with double hung vinyl windows of the same size;
  • Refinishing wood floors, installing new carpet or vinyl as needed;
  • Repairing and maintaining plaster scroll work on ceilings, and smaller specialty and stained glass windows, which were reglazed and painted;
  • Repairing the porches, rebuilding them to maintain the historic trim and woodwork;
  • Repairing the exterior by power washing, scraping and painting with colors that match the existing color scheme.

According to the Architectural Heritage of Genesee County, the property apparently was bought in 1855 by Batavia brewer Eli H. Fish but (per county tax records) the house was built in 1880. The house was greatly increased in size when Charles Hough purchased the property from Fish’s estate.

For many years it was the home of his son, Arthur Hough, and his wife, Colleen. In 1957, it was willed to the Genesee Community Chest and, two years later, that organization sold it to Lewis Root. In 1964, the Batavia Industrial Center became the owner and it was used as an office/apartment complex.

GCASA purchased the home in May 2019.

Because of its distinctive architectural styles, Queen Anne and Colonial Revival, and its contribution to a neighborhood that is rich in historical significance, the house was designated an historic landmark on Dec. 6, 2000 by the City of Batavia Historic Preservation Commission.

Burkel, who has been involved with the City HPC since its inception in 1996, said a project such as this is at the heart of the board’s mission.

“This is what we’re all about it.,” she said. “We have designated 46 properties and we meet as a committee whenever we need to address something with the properties, such as giving them certificates of appropriateness for any work they want to do on the property.”

She credited GCASA for maintaining the architectural integrity of the entire block of homes, including its main office at 430 E. Main St. and other agency buildings.

Photo at top: Genesee/Orleans Council on Alcoholism and Substance Abuse has restored 434 E. Main St., which is a City of Batavia historical landmark.

Photos at bottom: Nicole Davis, GCASA’s director of residential services, leads a tour for members of the City of Batavia Historic Preservation Commission, from left, Caroline Hosek, Sharon Burkel and Connie Boyd; The house, which has been divided into five apartments for permanent housing, features – among many other things -- original stained glass, cabinets and fireplace; Davis, Hosek, Burkel and Boyd on the front porch.

Photos by Mike Pettinella.

Disclosure: Mike Pettinella is the publicist for GCASA.

Hearing on proposed repeal and replacement of GC Ethics and Disclosure law is June 23

By Press Release

Legal Notice

NOTICE IS HEREBY GIVEN, That there has been introduced before the Legislature of the County of Genesee, New York, A Local Law Introductory No 2, YEAR 2021 GENESEE COUNTY NY, TO REPEAL AND REPLACE THE COUNTY OF GENESEE ETHICS AND DISCLOSURE LAW

Notice is further given that the Genesee County Legislature will conduct a Public Hearing on proposed Local Law Introductory No. 2, Year 2021 in the Legislative Chambers of the Old Court house, 7 Main Street, Batavia, NY and via Zoom Video Conference on the 23 day of June, 2021 at 5:30 pm. Written comments will be accepted until the close of business June 23, 2021. Contact the Clerk for the ZOOM link. All interested persons will be heard.

Pamela LaGrou, Clerk Genesee County Legislature June 10, 2021

Is your pet bird missing?

By Billie Owens

A caller reports a bird wearing several leg bands, "bracelets," is secured at a residence on Liberty Street in the city. It is believed to be someone's pet. An officer is responding to retrieve the bird and take it to the Genesee County Animal Shelter.

No descriptive information was relayed about the feathered friend.

With Labor Daze back on 2021 calendar, lots of work to do in Oakfield to get ready

By Howard B. Owens

It looks like there will be a Labor Daze celebration in Oakfield in 2021 after all.

Jamie Lindsley said the Oakfield Betterment Committee "jumped at the chance to reevaluate" hosting the event with COVID-19 restrictions lifted.

"Everything is planned and ready to go," Lindsley said. "Now we just need our local officials to help us get this done in a very compressed time frame."

Lindsley confirmed today that both the town and village are on board with supporting putting together a Labor Daze celebration even on short notice.

"What both are able to do complement each other and we're able to move forward," she said.

The late start on planning means a lot of work for a lot of people over the next three months.

"There are many challenges we will face in the planning of this event this year," Lindsley said. "From sponsorships to volunteers, we will need a lot of help getting Labor Daze going on short notice."

Photo: File photo from 2018 Labor Day Parade in Oakfield.

Photos: Law Enforcement torch run in support of the Special Olympics

By Howard B. Owens

Officers with the Genesee County Sheriff's Office and Batavia Police Department carried the Special Olympics torch today from the Sheriff's Office on Park Road to the Arc Genesee Orleans Center on Walnut Street in support of the Special Olympics.

Photos: Legislature designates June 'Dairy Month'

By Howard B. Owens

With the aid of the Genesee County Dairy Princess and her court, along with ice cream treats for everybody in the room, the Legislature declared June "Dairy Month" on Wednesday.

The current Dairy Princess is Amelia Brewer, 16 from Elba. Her court: Maggie Winspear, dairy ambassador, Jillian Brewer, dairy ambassador, and Claire Lamb, dairy maid.

Legislator Christian Yunker read the following resolution approved by the Legislature:

WHEREAS, The Dairy Industry has contributed to the development and prosperity of our community since the earliest formation of Genesee County, and

WHEREAS, Since 1937 the rich history of Dairy production and its producers has been recognized across our great nation in an effort to savor the natural goodness in one of the most wholesome agricultural products, and 

WHEREAS, Dairy farmers and farm workers strive to produce wholesome dairy milk which is used to make delicious dairy products like yogurts, cheeses, butter, sour cream, and ice creams that provide health benefits and valuable nutritional benefit to residents locally, regionally, and globally, and 

WHEREAS, in 2014 the fourth-graders at Byron-Bergen Elementary School began the push and later saw signed into law, the recognition of YOGURT as New York State’s official snack, and

WHEREAS, The Dairy Industry in Genesee County is a significant contributor to the economy of our County, its Bread, and Butter, allowing our landscape, citizens, and businesses to flourish, and 

WHEREAS, the USDA Food Box Program sent over 154 million boxes to our hungry neighbors during the pandemic brimming with high-quality Dairy products to fill a nutritional need nationally yet sourced locally, 

RESOLVED, That the Genesee County Legislature does hereby proclaim the Month of June, 2021 as DAIRY MONTH and extend our thanks to the dedicated men and women who produce world-class dairy products enjoyed nationwide.

Elba Onion Queen to be crowned June 18 from among 10 contestants

By Press Release

Submitted photos and press release:

There are 10 contestants seeking the crown of 2020 (yes, 2020) Elba Onion Queen. Due to the coronavirus pandemic, the annual pageant was cancelled last year. The organizers are excited to bring this back to the community with an incredible slate of young ladies who will graduate at the end of this month.

The 2020 Onion Queen will be crowned at 6:30 p.m. on Friday, June 18th at the Elba Park gazebo. At 6 p.m., a short "caravan" will take place with the contestants riding down Main Street and to the gazebo to begin the crowning at 6:30.

Please stay tuned toward the end of the summer, early fall for details regarding the 2021 Onion Queen contest.

Taylor Augello

Taylor is the daughter of Michael and Tracy Augello. She has resided in the Town of Elba for many years, along with the rest of the Augellos. She cherishes family moments and spending holidays together.

Taylor is proud of the relationships she has built with her family. She enjoys playing basketball, reading, going on walks with her Mom, hunting and shooting trap with her Dad and going on leisure rides with her sister.

Taylor has participated in National Honor Society, basketball, volleyball, Conservation Club and Student Athletic Association.

After graduation Taylor plans on attending Geneee Community College for the Nursing Program in order to obtain her RN and she would ultimately like to become an NP.

Leah Bezon

Leah is the daughter of Candy and Steven Bezon. She wrote that she comes from a long line of farmers in Elba. Her father, Steven, is a third-generation farmer who continues to run their family farm.

Leah says that her parents have instilled their work ethic and dedication into her and her siblings.

Leah enjoys being a three sport athlete at Elba Central School. She was thrilled to score her 1,000th point at a home basketball game and have the community celebrate with her.

She also has been a member of the Genesee County 4-H Beef Club for several years. Leah plans to go into the criminal justice field and will attend Genesee Community College for her first two years then plans to transfer to SUNY Brockport.

Madison Cline

Madison is the daughter of Nicole Scouten. She said her Mom and Stepdad are very hard working and she has three sisters and four brothers who are all very unique.

Madison enjoys baking desserts, she says it is very peaceful and always fun to try making things she has not tried before. Madison also enjoys taking her little brother on walks while watching after him.

During high school she was on the cheer and softball teams, Student Athletic Association, and in the National Honor Society. Madison plans to attend Daemen College for four years to earn a Bachelor of Science in Psychology and then continue on for her Ph.D in Psychology and work as a psychologist.

Madison Harrington

Madison is the daughter of Aaron and Danielle Harrington. She has participated in Student Athletic Association, Student Council, National Honor Society, Masterminds, SADD, Multicultural Club, FFA, soccer, volleyball and tennis.

Madison is also heavily involved with 4H, Fur and Feather Club, Dog Club, Teen Club, Market Poultry and holds office in many of the clubs. She is also a member of ARBA and National Belgian Hare Club.

Madison enjoys spending time at her “funny farm” and taking care of all her different animals. She will attend Alfred State College for four years, with hopes of earning a Veterinary Technology bachelor’s degree. Madison will also play on the women’s soccer team at Alfred State.

Madison Muehlig

Madison is the daughter of Drew and Erika Muehlig. She wrote that her family loves Elba and she is very prideful of the learning environment at Elba Central School.

She is a three-sport athlete and the Valedictorian of the Class of 2021. Madison participates in basketball, soccer, softball, Student Athletic Association, National Honor Society, Principal’s Cabinet, all while playing travel basketball year-round.

She also enjoys runs around the village, drawing freehand, going out to eat with family and friends and attending local sporting events.

Madison has been admitted to the Physical Therapy program at Daemen College where she plans to study for her Doctorate.

Kiah Rosendale

Kiah is the daughter of Heather Rosendale. She enjoys going on hikes, walks and going to museums.

Kiah wrote that her Grandma has taught her how to bake, cook and even shared new art techniques with her. She also says one of her hobbies is art and her Dad showed her many sculpting techniques.

She loves outdoor activities such as camping, archery and fishing.

In school, she is the Senior class and Yearbook Club treasurer, and has participated in Trivia Team, Masterminds, Student Council, National Honor Society, Future Teachers and HOBY Leadership Conference.

Kiah plans to attend Genesee Community College for two years then seek further education to achieve a Bachelor of Secondary Education degree in Science.

Lilliana Thompson

Lilliana is the daughter of Jeremy and Kim Thompson. She along with her parents and three siblings are very sports oriented. She says that supporting the community is a big part of who they are.

Liliana participates in soccer, basketball, softball, volleyball, Chorus and school plays. She also competes at Divine Dance Studio on the competition team. Liliana enjoys drawing, singing, going to church and adventures with her family at the lake.

She plans to play lacrosse during her off season. Liliana will attend Geneee Community College in the fall where she will continue her soccer career and study Elementary Education.

Fanny Venegas

Fanny is the daughter of Sandra Salcido and Jose Venegas. She says that the Elba community and especially the Elba Central School have been a great place to live and go to school. Fanny cannot imagine living anywhere as special as Elba.

She has enjoyed studying Graphic Arts at BOCES and has been a student athlete participating in many sports. Good health is important to Fanny and she enjoys cross-country, soccer, indoor and outdoor track.

After graduation Fanny will attend RIT, she plans to be a member of their cross-country and track teams. Her goal is to some day help her family buy a house in Elba that will be their home.

Brynn Walczak

Brynn is this daughter of Brian and Kim Walczak. She has been a three-sport athlete and high honor student at Elba Central School. Brynn wrote that her parents and twin brothers have been her number one supporters.

She has enjoyed playing soccer, basketball and softball and is proud of being a part of Elba’s five back to back sectional titles. Brynn scored her 1,000th point in basketball this year and was named the 2021 GR All-Star in basketball and soccer.

She has also participated in National Honor Society, Student Athletic Association, Genesee County Youth Bureau Leadership Conference and several basketball and soccer camps.

After graduation she plans to attend Daemen College to major in Physical Therapy and possibly participate in a sport.

Miah Werth

Miah is the daughter of Steven and Trisha Werth. She is currently a senior at Elba Central School where she is an active member of the FFA and serves as the chapter President.

Miah was also selected as the 2020 Genesee County Dairy Princess.

During her high school career she taken part in volleyball, basketball, track, Student Athletic Association and the 4H Beef Club.

Miah says that her favorite activity is volleyball and she enjoys spending time with her friends.

After high school Miah will attend Genesee Community College for Humanities and Social Science. Her passion is to help people feel better about themselves and she hopes to become a mental health counselor.

Arc boards tap Livingston-Wyoming chapter executive director to lead merger creating Arc GLOW

By Press Release

Submitted photo and press release:

The Boards of Directors of The Arc of Livingston-Wyoming and Arc of Genesee Orleans announce Martin Miskell, current executive director of the Livingston-Wyoming chapter, will lead the agencies through their planned merger.

The unification of the agencies serving individuals with intellectual and developmental disabilities and their families will create a one-chapter, four-county service area covering roughly 2,400 square miles—geographically, the largest Arc chapter in New York State.  

Miskell began his Arc career as director of finance at the Livingston-Wyoming chapter in 2002, becoming associate executive director/chief financial officer in 2007 and executive director in 2015. He calls this an exciting time.

“The merger will offer all four counties more program and service opportunities for individuals and families served,” Miskell said. “We have experienced changes over the last decade in the field of disabilities and this merger will make the agency and its services more fiscally sustainable and poised for the future.”

Over the last several months, Miskell has met with senior leaders, board membership and retiring Genesee Orleans Executive Director Donna Saskowski to develop a regional approach and plan for legal and programmatic strategies to ensure a smooth transition. The merger process is expected to take as long as five more months to complete.

The new agency will use consolidated resources to ensure quality services to all people with disabilities and their families served in the Genesee Livingston Orleans Wyoming (GLOW) counties region. Once merged, the new agency will be called Arc GLOW.  

Miskell grew up in the Geneseo area, and he and his wife, Theresa, have four adult children. He received his bachelor’s degree in Economics from SUNY Geneseo and his Master of Business Administration from Rochester Institute of Technology. He also serves on the NYS Genesee Valley Parks Commission, SUNY Geneseo Foundation, and is a member of the Kiwanis Club.

ABOUT THE CHAPTERS: The Arc of Livingston-Wyoming and Arc of Genesee Orleans, soon to be known as Arc GLOW are family-founded agencies dedicated to helping people with intellectual and/or developmental disabilities (I/DD) meet their full potential and find fulfillment in learning, personal relationships, employment, volunteerism, recreation, the arts, and more.

In the coming months, a new Arc GLOW website will be unveiled. In the meantime, the websites serving the chapters are www.arcgo.org and www.lwarc.org. For more information contact Director of Development & Community Relations Shelley Falitico at sfalitico@arcgo.org.

Problem gambling affects many, including those celebrating Pride Month, help is available

By Press Release

Press release:

Happy Pride Month! June is established to recognize the impact that gay, lesbian, bisexual, transgender, and queer individuals have had on the world. LGBTQIA+ groups celebrate this special time with pride parades, picnics, parties, memorials for those lost to hate crimes and HIV/AIDS, and other group gatherings.

It’s also important to recognize that the LGBTQIA+ community has been impacted by various mental health issues, including problem gambling. Problem gambling is anytime someone’s life is negatively impacted by their gambling habits. This could be financial struggles, relationship or partner issues, conflicts with work and school, and even translating to criminal behavior.

Unfortunately, there is limited research on the prevalence of gambling addiction among the LGBTQIA+ community. However, the information that is available does suggest that there is a correlation between problem gambling and those who identify as gay, bisexual, and transgender.

A 2006 U.S. study reports that 21 percent of 105 men seeking treatment for problem gambling identified as gay or bisexual. That percentage is seven times higher than the (reported) rate of gay and bisexual men in the general population (21 percent as opposed to 3 percent), raising the possibility that gay/bi men might be at increased risk for problem gambling (Grant, JE, and Potenza, MN, 2006).

Additionally, a 2015 Australian study reports that 20.2 percent of 69 LGBT participants met DSM V criteria for gambling disorder. Pub/slot games (58 percent) and scratch-offs (43 percent) were most common about LGBTI populations. The amount spent ranged from $1 - $3K per month. Reasons were “because it is fun” and “because I like the feeling.”

The most important takeaway from these limited studies is that it’s important to have a comprehensive screening system in place for all individuals receiving treatment for problem gambling, especially screening specifically for LGBTQIA+ folks who are already in care or seeking treatment for mental health or chemical dependency needs.

First and foremost, establishing a safe environment for clients should be a normalized step within all counseling and therapy-related practices. Secondly, help is available for problem gambling no matter how you identify.

The Western Problem Gambling Resource Center (PGRC) is excited to promote our clinicians who are experienced in treating LGBTQIA+ individuals, as well as have training in cultural humility. Below are some barrier-free options the Western PGRC offers our community:

  1. In person or teletherapy counseling (individual or couples therapy)
  2. Connection to Gambler’s Anonymous or Gam-Anon
  3. Online family support group
  4. Guidance through the NYS Casino Self-Exclusion Program
  5. Online tools and resources, including self-assessment screening
  6. Connection to statewide inpatient and outpatient treatment services

To get started, call the Western PGRC at (716) 833-4274 or email WesternPGRC@nyproblemgambling.org

For more information, visit https://nyproblemgamblinghelp.org/.

Plug Power, Quicklee's, Town of Le Roy, Liberty Pumps referrals part of 15-item county planning agenda

By Mike Pettinella

The Genesee County Planning Department is recommending approval of a site plan review submitted by Plug Power Inc., the Latham-based company specializing in the development of hydrogen fuel cells systems for applications such as heavy-duty freight and forklifts.

The referral is one of 15 on the agenda of the county planning board’s meeting scheduled for 7 p.m. Thursday via Zoom videoconferencing.

According to information provided to the planning department, the site plan to place the green hydrogen facility at the Western New York Science & Technology Advanced Manufacturing Park includes three structures – an 8,000-square-foot operations and maintenance building, a 40,000-square-foot electrolyzer building and a 68,000-square-foot compressor building.

STAMP, located on Crosby Road in the Town of Alabama, is designated as a Technology (T-1) District.

Additional documentation indicates the Genesee County Economic Development Center, which owns STAMP, is in the final stages of closing the sale of 29.884 acres to be allocated to the Plug Power venture, which is being called Gateway Project.

The full environmental assessment form filled out by Plug Power reveals that construction will take place in two phases, with phase one to commence in March 2022 and phase 2 to be completed in June 2023.

It is projected that the company will use 280,000 gallons of water per day, with expected additional capacity from the construction of two new water lines. Company officials state that 70,500 gallons of wastewater will be generated each day. The grounds also will feature a stormwater management facility.

Approximately 16 tanker trucks will come to the facility each day on a reconstructed Crosby Road to provide a new access path. Construction is expected to take place from 7 a.m. to 5 p.m. Monday through Friday. Once complete, it will be a 24-hour operation.

Last Thursday, Genesee County Economic Development Center directors approved approximately $2.8 million in sales tax incentives related to the construction of the electrical substation.

The GCEDC reported that Plug Power is investing $232 million the company to build the facility, which is estimated to create 68 full-time jobs.

The company also is investing $55 million toward the construction a substation that will enable 100-percent renewable, reliable electricity at less than $0.035/kwh to future tenants in partnership with the New York Power Authority and National Grid.

Other referrals of note:

  • Special use permit, area variance and site plan review for a Quicklee’s convenience store and four-pump fuel station island at the former Bob Evans Restaurant location in a Commercial (C-2) District at 204 Oak St. (Route 98) in the City of Batavia.

The area variance is necessary because the service station is 165 feet from a church (less than the minimum 500 feet) and the proposed number of parking spaces is 40 (less than the minimum 68).

Patricia Bittar, director of land development projects at WM Schutt Associates, filed the application, stating that the proposed project will take up 2,771 square feet for the convenience store and 1,000 square feet for a drive-thru restaurant.

The planning department recommends approval. The applicant also will have to go in front of the City Planning & Development Committee and Zoning Board of Appeals.

  • Site plan review for a 107,138-square-foot addition for warehousing and manufacturing to Liberty Pumps, 7000 Apple Tree Ave., Bergen

The planning department recommends approval with modifications pertaining to stormwater prevention and archaeological impact documentation.

  • As previously reported on The Batavian, a zoning map change request from the Le Roy Town Board to rezone seven parcels from Residential (R-2) to Light Industrial (I-2) District to expand the GCEDC-owned Le Roy Food & Tech Park on Route 19 ad Randall Road in the Town of Le Roy.

This action could open the door for Great Lakes Cheese of Hiram, Ohio, to build a $500 million processing plant at the site.

The planning department recommends approval since the Comprehensive Plan adopted by the Town of Le Roy in 2017 identifies this area in its Future Land Use Plan as Agriculture and adjacent to Industrial.

  • Zoning text amendments from the Oakfield Town Board for the entire Town of Oakfield to allow major solar collection systems to the Land Conservation (LC) and Agricultural-Residential (AR) Districts and to add public and private utilities to the LC District.

The towns of Oakfield and Elba are gearing up for the proposed construction of a 500-megawatt solar farm by Hecate Energy, which today announced that is has filed an application with the New York State Office of Renewable Energy Siting.

If approved and constructed, the Cider Solar Farm would be the largest solar project ever built in New York State.

Hecate Energy’s press release indicated that the $500 million private infrastructure investment is expected to create moe than 500 construction jobs and will be capable of supplying 920,000 megawatt-hours of renewable electricity per year – enough to power more than 120,000 average New York households.

The planning department is recommending approval.

  • A special use permit for Chad Downs, 1300 McVean Road, Darien, to place a pest control business in his home, which sits in a Low Density Residential (LDR) District.

The planning department recommends approval with the modification that the storage and disposal of herbicides, pesticides and other hazardous materials must be conducted in accordance with applicable State and Federal regulations.

Architect's rendering at top: 3D view of the Plug Power facility to go at WNY STAMP. The rectangle building at the front is the compressor building and the long building behind it is the electrolyzer building. The operations and maintenance building is the smaller structure at right.

Authentically Local